Boiler Room
The end of this complex is approaching, so I decided to visit it while I still can and while the buildings are still in reasonably good condition. The boiler room was originally used mainly to produce process steam for drying and pressing wood in the adjacent halls. In 1962–1963, a heated swimming pool for employees and the public was built on the grounds. The water was heated using residual heat from the wood processing plant.
During the expansion of the complex, the bed of the adjacent river was rerouted twice. However, this did not help, and in July 1997, a massive flood swept through the entire complex, causing damage estimated at approximately 150 million crowns. In 1999, a large part of the company (specifically, the particleboard production) was purchased by a competing Austrian firm. That company immediately halted production, and the halls have since served only as warehouses. The boiler room itself remained in operation until the end of 2002. In 2007, all operations at the wood processing plant were discontinued.