Continuation of the excursion through the uranium district, where the total depth of the pits dug from the surface is 17.4 km and 5.6 km is the depth of the blind pits. An incredible 2,188 km of mine tunnels and drifts have been driven, 1,622,500 m3 of tailings have been extracted and deposited in 14 tailings dumps up to 50 m high. The highest is at this shaft, which operated in 1955-91 and figure...
























Nothing found nearby.